Loading...
Loading...
Loading...
The following sections outline the supported configurations and limits for features. While most limits are listed here, you can view the details of technical limits, such as rate limiting on Genesys Cloud Limits.
| Scope | Limit | Enforced? | Notes |
|---|---|---|---|
| Business unit | 250 | Yes |
|
Built-in categories contain a default activity code of the same name. You cannot delete a built-in category, and you can edit, but not delete, the default activity code.
| Default activity code | Length in minutes | Counts as paid time | Counts as work time |
|---|---|---|---|
| Break | 15 | Yes | No |
| Meal | 30 | No | No |
| Meeting | 30 | Yes | Yes |
| Off Queue | 60 | Yes | Yes |
| On Queue | 120 | Yes | Yes |
| Time Off | 120 | No | No |
| Training | 30 | Yes | Yes |
| Unavailable | 60 | No | No |
| Scope | Limit | Enforced? | Notes |
|---|---|---|---|
| Activity Plans | 100 | Yes | A business unit can have 100 active activity plans. |
| 500 | Yes | A business unit can have 500 inactive activity plans. | |
| 6000 | Yes | A business unit can have 6000 agents per activity plan. | |
| 1000 | Yes | A business unit can have 1000 occurrences per activity plan. | |
| 6000 | Yes | A business unit can have 6000 sessions per occurrence per activity plan. |
The following limits are the maximum sizes of items that have been designed and tested. While these limitations are not enforced, exceeding them results in performance degradation, timeouts, or other errors:
| Scope | Limit | Enforced? | Notes |
|---|---|---|---|
| Forecast | 200 | Yes | For more information, see Forecast modifications. |
You can review the limits and its default setting. You can also check if they are configurable via Genesys Cloud Limits. The planning.groups.per.business.unit.max key defines the maximum number of planning groups that you can configure in a business unit.
| Scope | Limit | Enforced? | Notes |
|---|---|---|---|
| Business unit | 1,000 | Yes | Can add 1,000 staffing groups per business unit. |
| Agents | 2,000 | Yes | Can add 2,000 agents per staffing group. |
You can review the limits and its default setting. You can also check if they are configurable via Genesys Cloud Limits. The planning.groups.route.paths.per.business. unit.max key defines the total number of route paths you can configure across all planning groups within a business unit, while the planning.group.route.paths.max controls key defines the number of route paths you can configure for a single planning group.
You can review the limits and its default setting. You can also check if they are configurable via Genesys Cloud Limits. The planning.groups.skills.max key controls the number of skills allowed per planning group. The planning.groups.skills.per.business.unit.max key controls the total number of skills allowed across all planning groups within a business unit.
| Scope | Limit | Enforced? | Notes |
|---|---|---|---|
| Business unit | 100 | Yes |
| Scope | Limit | Enforced? | Notes |
|---|---|---|---|
| Work plan | 10 | Yes |
| Scope | Limit | Enforced? | Notes |
|---|---|---|---|
| Forecast | 8 | Yes | For weighted historical index method. |
| Scope | Limit | Enforced? | Notes |
|---|---|---|---|
| Management unit | 2000 | Yes | The system enforces a limit of 75,000 shift possibilities that any given shift could produce. The system calculates the number of shift possibilities by multiplying the number of possible shift start times by the number of possible activity start times for a specified shift. Because the system does not use the scheduling service to determine invalid start times, for example, overlaps or contiguous time constraints, it includes them in the count. |
The system calculates these instances as 5 x 5 x 5 x 5, or 625 possible shifts created from one shift in the work plan.
Assume you also have a self-training activity that could start every 15 minutes across the day, resulting in a possibility of 32 start times. This addition increases the number of possible shifts created from the shift to 20,000 (625 x 32).
| Scope | Limit | Enforced? | Notes |
|---|---|---|---|
| Work plan bid | 1 | Yes | The system enforces a limit of only one open work plan bids per business unit. |
| Work plan bids groups | 50 | Yes | The system enforces a limit of 50 bid groups per work plan bid under a business unit. |
| Agents per bid group | 1500 | Yes | Can have 1500 agents per bid group under a management unit. |
| Planning groups per bid group | 15 | Yes | Can have 15 planning groups per agent. |
| Work plans per bid group | 50 | Yes | Can have 50 work plans per bid group. |
| Bid window only allows for future dates | 1–6 weeks | Yes | Minimum one week and up to six weeks. The bid window allows only future dates and within the range. |
| Effective dates | 1 day–6 weeks | Yes | The effective date must be after the bid closes by one day and within six weeks after the bid window closes. |
| Number of bids in the Draft state per business unit | 20 | Yes | |
| Number of bids in Locked/Optimized/Scheduled/Open states | 1 | Yes |
| Scope | Limit | Enforced? | Notes |
|---|---|---|---|
| Management unit | 1000 | Yes |
| Scope | Limit | Enforced? | Notes |
|---|---|---|---|
| Work plan rotation | 60 | Yes | The system enforces a limit of 20 separate rotating positions in each work plan rotation. |
Get user feedback about articles.